Due to the production need to accelerate the machining process of the overall parts of the tram chassis, our company has started a project to optimize and reduce the time spent on rearranging the overall parts during machining. Namely, to find an opportunity to machine the part from four sides without rearranging the base part.
At this stage, a trial spar is being machined. Control measurements will show the result of the work of specialists and the economic contribution of the entire project.
Product material: steel 20GL GOST 977-88